Skip to content
Monday – Friday: 7 a.m. – 4 p.m. · Saturday: Estimate visits by appointment · Sunday: ClosedMonday – Friday: 7 a.m. – 4 p.m.Painting and decorating (C-33) · CA Lic. 000000VerifyGeneral liability and workers' compensation · Your insurance carrier
1 more license
  • Painting and decorating (C-33) · CA Lic. 000000Verify
  • General liability and workers' compensation · Your insurance carrier
(415) 555-0101

Victorian exteriors

Bays, brackets, gables and shingles

This page covers the outside of a San Francisco Victorian or Edwardian, from the roofline to the sidewalk: what needs to happen, in what order and how long it takes.

You need it when paint is peeling at the bays, when the trim has gone gray and bare, or when a house has been one color for too long. A scheme and a repair list come first, then the scaffold.

A gray Victorian house with painted trim on a sunny San Francisco street

Prep checklist

What every exterior gets before paint

  • Scrape and vacuum

    Loose paint comes off with hand scrapers. A HEPA vacuum on the tool catches the dust.

  • Repair the wood

    Soft trim and split shingles are replaced to match, not covered over.

  • Caulk and fill

    Open joints at casings and corner boards are sealed. Holes are filled and sanded.

  • Prime bare wood

    Every patch of bare wood is primed so the finish coat dries evenly.

  • Mask and cover

    Glass, hardware, plants and the sidewalk are covered before any color goes on.

  • Walk the list

    You get the repair list with photos and locations before the scaffold comes down.

Finishes

Which sheen goes where

Brand-neutral, and always with the product data sheet in your hands.

  • Body and shingles

    A low-sheen exterior paint. It hides small flaws in old wood.

  • Trim and casings

    Satin or semi-gloss, which sheds water and wipes clean.

  • Sash and doors

    Semi-gloss, for edges that get touched.

  • Small details

    Gloss for brackets, rosettes and carved pieces, where light should catch.

How long it takes

Days on the scaffold, as ranges

Ranges you can edit, by house size. Your written estimate gives the days for your house.

  • 5 to 8 days

    Flat-front, two stories

    Three colors, ordinary repairs, one set of scaffold.

  • 8 to 14 days

    Bay and gable, three stories

    Five colors, a bay, brackets and a second body color.

  • 14 days and up

    Tower, scrollwork and shingles

    Seven colors, where the details set the pace.

Weather days are not counted. Terms, limits and exclusions of the warranty are in your written warranty.

Questions about exteriors

How long does a Victorian take?

Most two- and three-story houses are on the scaffold for one to three weeks, depending on how much wood needs repair and how many colors are going on. You get a day range in writing, not a promised date, because fog and rain move the days.

How many coats, and what sheen?

Bare wood gets primer, then two coats. Body and shingles take a low-sheen exterior paint, trim a satin or semi-gloss, sash and doors a semi-gloss, and small details can take gloss. Ask for the product data sheet for any paint we propose.

What does weather do to the schedule?

Dry months from May to October are the exterior season. Summer mornings are foggy, so we start the sunny sides first and wait for walls to dry. A rain day is a day off, and the schedule moves instead of being squeezed.

What does the warranty cover?

Peeling and blistering of the paint we apply, under the conditions in your written warranty. Terms, limits and exclusions are in your written warranty, which we hand you before work starts.

Start with a walk around the house

We look from the sidewalk and from the roofline, then write down what we see.